Apartment
WF Kings | Belgrade | Serbia
Area: 47 m2
The existing classic electrical system was upgraded: new lighting zones were added, including track lighting, classic lighting, and LED lighting for the ceiling and furniture. Outlet groups were also expanded and modified.
The work included preparation of documentation, rough-in and final installation, electrical panel upgrade, and commissioning.
Technical Requirements:
  • Upgrade of the existing classic electrical system
  • Addition of new lighting zones: 48V track lighting, classic lighting, LED lighting for the ceiling and furniture, and others
  • Expansion of outlet groups and modification of existing ones

Control:
  • Classic wall switches

Scope of Work:
  • Technical documentation
  • Rough-in installation stage: opening up ceiling structures, wall chasing, and cable routing
  • Final installation stage: installation of switches and outlets, equipment connection, installation of track lighting, LED lighting, and other lighting fixtures
  • Electrical panel upgrade
  • Commissioning

Equipment Used:
  • Switches and outlets: Aling Conel
  • Lighting: Braytron and others
  • Rough-in materials: HILTI, Aling Conel, and others